top of page

Abstract

Abstract Statement: The purpose of this senior project is to create a jig that will enable a c-clamp to be locked in place. While it is held in place a milling operation will be done to face the clamping surfaces. There is a separate bushing holder that can be bolted onto the main mount so a hole can be drilled precisely on the threaded end of the c-clamp. To see this project through, it will require the use of engineering analysis techniques that have been learned in previous classes to find the forces applied to the c-clamp while it is held in place. Once the forces are found and the dimensions of all necessary parts are finalized on green sheets they will be drawn on computer aided design software. After everything has been made to fit on the computer, raw material and hardware will be purchased to start the construction part of the project. The school has the necessary equipment to do all the machining operations needed for the project, so everything will be done on campus. The testing procedure involves putting the free end of the c-clamp under a pre-determined load in the x, y, and z axes to test if the toggle clamps can hold it in place. The completed project meets all of the standards that were found in the analysis stage of the project and functions as originally envisioned.

Keywords: <project>, <c-clamp>, <construction>

bottom of page